OMS completes measurement and fit-up at Zuluf oil field

OMS has successfully completed pipe-end measurement and fit-up work at the Zuluf Field Expansion project, owned and operated by Saudi Aramco. Contracted by McDermott, OMS carried out laser pipe-end measurement of over 33,000 pipe ends of 42” diameter, with varying wall thicknesses. Following measurement, we provided data and SmartFit fit-up analysis along with HiLo measurement to ensure the pipeline would conform to rigorous standards set by Saudi Aramco. Work took place onshore and offshore during the pipe-laying process.

The Zuluf field is a super-giant oil field located in the Arabian Gulf, 40km from the north-east coast of Saudi Arabia. Saudi Aramco is seeking to expand the field to increase production from 800,000 bpd to 1.4 million bpd.

Previous
Previous

Operations and mechatronics teams grow in 2025

Next
Next

New contract wins in 2025